Congratulations to the website of Jiangsu Changrong Chemical Equipment Co.,ltd


Jiangsu Changrong Chemical Equipment Co.,ltd was founded in 1984, located in Yangzhou, a famous historical and cultural city. The company's headquarters is located in Ganjiang Industrial Park B, covering an area of 45,500m2, with a building area of 30,000m2, and now has a modern riveting and welding workshop of more than 28,000m2. Yizheng plant covers an area of 61,500 m2, has been put into use more than 18,000 m2 riveting and welding workshop. the company has a variety of large sets of production equipment more than 200 sets, processing equipment sophisticated testing equipment is complete, complete testing means. We have φ5m three-spindle CNC high-speed drilling machine, φ2.5m vertical lathe, δ80 plate coiler, δ16 plate shear, 500T bending machine, 12m planing machine, 12m CNC cutting machine, 15 automatic welding machines, 4 automatic pipe and plate welding machines, 8m gantry milling machine, two multi-layer wrapping machines, 5 tons, 20 tons, 50 tons, 75 tons crane crane and other large processing and manufacturing equipment and 250m2 flaw detection Room and physical and chemical room, welding test room, etc. The company has more than 200 employees, nearly 50 professional and technical personnel, more than 20 with senior titles and 35 licensed welders, with strong technical force.

  The company is qualified to design and manufacture A1 and A2 pressure vessels, mainly engaged in the design and manufacture of (A1) high-pressure vessels, (A2) I, II, III low and medium pressure vessels for petroleum, chemical, fertilizer and winery industries. The company has a sound quality management system and has passed the ISO9001-2008 and ISO 14001-2004 quality management system certification, with a perfect quality management system and the enterprise has obtained the national measurement qualified confirmation unit. From product market research and development, design, raw material procurement, processing, welding, assembly, inspection and testing, delivery and after-sales service, all are carried out in a controlled state according to standards and specifications. The company processes tower equipment diameter up to φ8200, height 52m, horizontal storage tank diameter up to φ6500, heat exchanger diameter φ5400, stirring kettle type diameter φ3600 and all kinds of high-pressure equipment such as ammonia synthesis tower, separator, buffer, heat exchanger and multi-layer wrapping equipment, etc. Materials include carbon steel, stainless steel, non-ferrous metals, titanium, nickel, aluminum and other alloy materials, composite materials, varieties involving Various specifications of heat exchangers, separators, reactors, large towers, filters, etc.

  Our company has a high influence especially in the field of caprolactam and hydrogen peroxide engineering, hydrogen peroxide from 1992 to now, our company has undertaken technology transfer, equipment design and manufacturing processing of 3 to 4 sets of hydrogen peroxide engineering every year, and has a whole set of mature experience and processing team for the manufacture of hydrogen peroxide main tower equipment, and a number of hydrogen peroxide equipment engineering has won national patents, and our products are sold to domestic and foreign. Our company is involved in the manufacture of non-standard equipment for domestic caprolactam projects, Baling Petrochemical, Shandong Haili, Jiangsu Haili, Shandong Dongjiu, Inner Mongolia Qinghua, China Tianchen Engineering Co. Our company is a resource supplier of Sinopec and China Petroleum equipment, and has been awarded AAA grade credit rating by banks and provincial-level contract and credit-keeping units for many years, with a total registered capital of 82.35 million yuan and total fixed assets of over 100 million yuan, and total sales revenue of over 100 million yuan in 2016.

  In order to seek greater development, the company has acquired another 61,500m2 of land in Yizheng Industrial Park (5 km west of Runyang Bridge, along the highway of the river) and built a modern riveting workshop of 18,000m2 and a modern office building of more than 3,000m2, with complete supporting facilities, and the annual production volume can reach more than 100 million yuan, and is now actively cooperating with Zhejiang Engineering Design Institute, Jiangsu Chemical Design Institute and other domestic research institutes. Active cooperation.

  The quality policy of our company is "to sincerely develop the image of Changrong, to strictly control the quality of products, to create the reputation of the enterprise with the reality, and to develop the market with the new". We are willing to provide new and old customers with high quality products and services, and we are willing to create a better tomorrow together with you.

 

Related news


What is liquid flooding, flooding tower and flushing tower?

Distillation tower operation, liquid flooding, flooding tower, flushing tower is often silly, they appear when the tower parameters change response is not sensitive, which often delays the solution to the problem, affecting the production of the device.


Have you really mastered all the knowledge of heat exchangers?

A heat exchanger is a device that transfers some of the heat from a hot fluid to a cold fluid, i.e., a large closed vessel filled with water or other media, while having pipes running through it. The hot water is allowed to flow through the pipe.


Reactor Stirrer Basics

The stirrer is one of the key components of the reactor. Choosing the appropriate stirrer according to the physical properties, capacity and stirring purpose of different media in the kettle can play a great role in promoting the speed of chemical reaction and improving the production efficiency.


Pressure vessel rework welds, the same part of the rework more than 2 times qualified?

Weld rework during the manufacturing process cannot be completely avoided. In order to ensure the quality of welding rework, there are several requirements as follows.


Reasons why the stainless steel reactor does not operate

If the stainless steel reactor is not removed or replaced, the test will operate or close the vent to the reactor to avoid an explosion. Working pressures and leak tests are flammable. No fire analysis, no fire, no fire. Valves and flange base bolts shall be tightened at working pressure.